Skip to main content

Logistics & crew

The room has to be built before it can be beautiful.

This surface reads the production declarations you already made. It computes crew load, shared-access collisions and expected arrivals; a missing crew count or dock stays missing instead of becoming a house assumption.

The answer

Fail closed

No production tasks are declared, so crew and load-in cannot be scheduled.

What causes it
Not established yet.
What changes it
Declare production tasks in Vendor Pack with duration, phase and responsible vendor.
Inputs, assumptions and working

Read from the Vendor Pack declarations and the Event Project. Load-in starts at a time nobody has set, so calls show as offsets.

Crew-hours count only the tasks with a declared crew: 0 hours known, 0 tasks with no crew count. A missing count stays missing; it is not filled with a house assumption.

A collision is two declared calls on the same access point at the same time. Vendor capacity is never inferred.

Peak declared crew

Known crew-hours

Expected arrival lines

0

Access collisions

0

Operational gaps

What still costs somebody a phone call

Resolve

No production tasks are declared, so crew and load-in cannot be scheduled.

Declare production tasks in Vendor Pack with duration, phase and responsible vendor.

Crew calls

Who is on the floor, and when

No schedulable production tasks are declared yet.

Venue access evidence

What the building has actually told you

No venue access evidence is carried into this event yet.

Arrival register

What has to reach the building

No arrival-bearing rental or own-stock lines are on the Event Project yet.